C-19, r. 3 - Regulation respecting construction contracts of municipal bodies

Full text
5. (Revoked).
O.C. 841-2011, s. 5; S.Q. 2015, c. 8, s. 95.
5. Before entering into a contract with a subcontractor referred to in the second paragraph of section 2, a contractor referred to in the first paragraph of section 2 must obtain a copy of the subcontractor’s attestation and make sure that it complies with the second paragraph of section 4.
O.C. 841-2011, s. 5.